Guide to Construction: Difference between revisions
(chenlina) |
(→Bookcase: Added the quantum pad here too, seeing as we seem to have two identical pages?) |
||
(5 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
For the basics on construction and deconstruction, see [[Basic Construction]].<br /> | |||
For the construction of machines, see [[Guide to Advanced Construction]].<br /> | |||
For the construction of weapons, see [[Improvised Weapons]]. | |||
== Construction == | |||
=== [[Construction materials|Advanced Materials]] === | |||
==== [[File:Rods.png]] [[Construction materials#Rods|Rods]] ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x [[File:Metal.png|Metal]] | |||
|} | |||
Use <font color="gray">'''metal'''</font> and click "2x metal rods" (makes two sets of rods) | |||
==== [[File:Floor_Tiles.png]] [[Construction materials#Floor tile|Floor tiles]] ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x [[File:Metal.png|Metal]] | |||
|} | |||
Use <font color="gray">'''metal'''</font> and click "4x floor tiles" (makes 4 floor tiles) | |||
==== [[File:Glass_r.png]] [[Construction materials#Reinforced glass|Reinforced Glass]] ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x [[File:Rods.png|Rods]], 1 x [[File:Glass.png|Glass]] | |||
|} | |||
Use <font color="gray">'''rods'''</font> on <font color="blue">'''glass'''</font> | |||
==== [[File:Metal_r.png]] [[Construction materials#Reinforced metal|Reinforced Metal]] ==== | |||
Smelted with a combination of iron ore, coal and platinum ore ore at the [[Mining#The_Ores|Mining]] furnace. | |||
=== Floor === | |||
==== [[File:Lattice.png]] Lattice ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x [[File:Rods.png|Rods]] | |||
|} | |||
The basic base for all types of construction, this is placed directly in space. | |||
Place by having rods in your hand, and clicking on a empty space tile. | |||
==== [[File:Plating.png]] Plating ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x [[File:Floor_Tiles.png|Floor tile]] | |||
|} | |||
The basic floor which you put things like wires and pipes upon, 'all' floor is built ontop of this. | |||
Place by having the floor tile in your hand, and click on a lattice. | |||
==== [[File:Floor.png]] Steel Floor ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x [[File:Floor Tiles.png|Floor tile]] | |||
|} | |||
This is the basic "nice" floor, this floor should be considered used in all public areas, hence why | |||
there's none of these in maintence. | |||
Place by having the floor tile in your hand, and click on a Plating tile. | |||
==== [[File:LightFloor.gif]] Light Floor ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x [[File:Glass.png|Glass]], 1 x [[File:Metal.png|Metal]], 5 x [[File:CableCoils.png|Wire Coil]] | |||
|} | |||
''Assuming there already is a plating'' | |||
Use the wire on glass | |||
Use the metal on the tile you get | |||
Place the light tile on the plating | |||
=== [[File:Wall.png]] Walls === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|2 x [[File:Metal.png|Metal]], 2 x [[File:Metal.png|Metal]] OR any stacked material | |||
|} | |||
Click the <font color="gray">'''metal'''</font> in your hand to open the construction panel, | |||
Choose 'wall girders' from the list | |||
Use the remaining 2 sheets of <font color="gray">'''metal'''</font> (or some other material) on the girders | |||
=== [[File:R_wall.png]] Reinforced walls === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|2 x [[File:Metal.png|Metal]], 4 x [[File:Metal_r.png|Reinforced metal]] OR any stacked material | |||
|} | |||
Click the <font color="gray">'''metal'''</font> in your hand to open the construction panel, | |||
Choose 'wall girders' form the list | |||
Right-click on the girders with your <font color="gray">'''reinforced metal'''</font> (or some other material) in hand and choose "Reinforce girder" | |||
Use the last sheet of <font color="gray">'''reinforced metal'''</font> (or some other material) on the reinforced girders to finish the wall | |||
=== [[File:Grille.png]] Grille === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|2 x [[File:Rods.png|Rods]] | |||
|} | |||
Stand where you wish the grille to be placed | |||
Click on the stack of 2 <font color="gray">'''rods'''</font> with the hand you have them in | |||
=== Glass panels === | |||
==== [[File:Glass_panel.png]] One directional ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x [[File:Glass.png|Glass]], [[File:Screwdriver_tool.png|Screwdriver]] | |||
|} | |||
Click the <font color="blue">'''glass'''</font> pane | |||
Click the "one direct" button | |||
Right-click the new pane and rotate it | |||
Use the screwdriver to fasten it down | |||
Alternatively: | |||
Use the glass on a grille. | |||
Right-click the new pane and rotate it | |||
Use the screwdriver to fasten it down | |||
==== [[File:Glass_wall.png]] Full ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|2 x [[File:Glass.png|Glass]], [[File:Screwdriver_tool.png|Screwdriver]] | |||
|} | |||
Click the <font color="blue">'''glass'''</font> pane | |||
Click the "full" button | |||
Use the screwdriver to fasten it down | |||
=== Reinforced glass panels === | |||
==== [[File:Glass_panel_r.png]] One directional ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x [[File:Glass_r.png|Reinforced glass]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:Crowbar.png|Crowbar]] | |||
|} | |||
Click the <font color="blue">'''reinforced glass'''</font> pane | |||
Click the "one direct" button | |||
Right-click the new pane and rotate it | |||
Screwdriver (Secure frame to floor.) | |||
Crowbar (Pop pane in.) | |||
Screwdriver (Secure pane.) | |||
Alternatively: | |||
Use the reinforced glass on a grille. | |||
Right-click the new pane and rotate it | |||
Screwdriver (Secure frame to floor.) | |||
Crowbar (Pop pane in.) | |||
Screwdriver (Secure pane.) | |||
==== [[File:Glass_wall_r.png]] Full ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|2 x [[File:Glass_r.png|Reinforced glass]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:Crowbar.png|Crowbar]] | |||
|} | |||
Click the <font color="blue">'''reinforced glass'''</font> pane | |||
Click the "full" button | |||
Screwdriver | |||
Crowbar | |||
Screwdriver | |||
==== [[File:windoor.png]] Window-door (Windoor) ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|5 x [[File:Glass_r.png|Reinforced glass]], 4x [[File:Rods.png|Rods]], 1x [[File:CableCoils.png|Wire coil]], [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:Crowbar.png|Crowbar]], 1x [[File:Circuitboard.png|Circuitboard]] | |||
|} | |||
Click the <font color="blue">'''reinforced glass'''</font> pane | |||
Click the "Windoor" button | |||
Wrench | |||
Rods(Optional: To create a secure windoor) | |||
Cable | |||
Airlock Electronics | |||
Crowbar | |||
=== Hidden Door === | |||
==== [[File:False_Wall.gif]] Regular ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|4 x [[File:Metal.png|Metal]], [[File:Crowbar.png|Crowbar]] | |||
|} | |||
Click the <font color="gray">'''metal'''</font> in your hand to open the construction panel, | |||
Choose 'Build wall girders' form the list | |||
Use crowbar on girders and wait a few seconds for the girders to dislodge. | |||
Use the remaining 2 sheets of <font color="gray">'''metal'''</font> on the girders | |||
To turn a wall into a hidden door, follow the deconstruction guide for the wall type until the final wrenching, and instead proceed from the "Use crowbar on girders" line above. | |||
==== [[File:False_Wall_r.gif]] Reinforced ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|2 x [[File:Metal.png|Metal]],2 x [[File:Metal_r.png|Reinforced metal]], [[File:Crowbar.png|Crowbar]] | |||
|} | |||
Click the <font color="gray">'''metal'''</font> in your hand to open the construction panel, | |||
Choose 'Build wall girders' form the list | |||
Use crowbar on girders and wait a few seconds for the girders to dislodge. | |||
Use the <font color="gray">'''reinforced metal'''</font> on the dislodged girders twice to finish it | |||
=== Wall Mountings === | |||
==== [[File:APC.png]] APC ==== | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|2 x [[File:Metal.png|Metal]], 1x [[File:CableCoils.png|Wire coil]], 1x [[File:Circuitboard.png|Circuitboard]] Power Control Module, [[File:Screwdriver_tool.png|Screwdriver]], 1x [[File:Power_cell.png|Power Cell]], [[File:Crowbar.png|Crowbar]], [[File:Id regular.png|Authorized ID]] | |||
|} | |||
Use the 2 sheets of metal and create an APC frame. | |||
Place the frame on the wall you wish to attach the APC to. | |||
Add the Power control module to the APC | |||
add the wire coil. | |||
Use the screw driver on the APC. | |||
Insert the Power Cell. | |||
Crowbar shut. It starts ID locked, with the cover engaged and the main switch turned off. | |||
APCs may only be placed in areas which have been defined as a Station Area using the Chief Engineer's [[High-risk_items|Station Blueprints]]. If you're trying to replace a broken APC, you can get the cover off by breaking it, likely with a fire extinguisher. | |||
==== [[File:AirAlarm.png]] Air Alarm ==== | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|5 x [[File:Metal.png|Metal]], 1x [[File:CableCoils.png|Wire coil]], 1x [[File:Circuitboard.png|Circuitboard]] Air Alarm Electronics, [[File:Screwdriver_tool.png|Screwdriver]] | |||
|} | |||
Use 5 steel sheets to construct a "Frame". | |||
Pick up the "Frame Parts" that you just created. | |||
With Frame Parts selected in your hands. Click on a wall to open a menu. Select "Air Alarm." A air alarm will be placed on the wall. | |||
Secure the Air alarm with a wrench. | |||
Insert circuit board (Air alarm) into the Air Alarm. | |||
Use screw driver on it. | |||
Add 5 wires to it. | |||
Use screw driver on it. | |||
==== [[File:FireAlarm.png]] Fire Alarm ==== | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|5 x [[File:Metal.png|Metal]], 1x [[File:CableCoils.png|Wire coil]], 1x [[File:Circuitboard.png|Circuitboard]] Fire Alarm Electronics, [[File:Screwdriver_tool.png|Screwdriver]] | |||
|} | |||
Use 5 steel sheets to construct a "Frame". | |||
Pick up the "Frame Parts" that you just created. | |||
With Frame Parts selected in your hands. Click on a wall to open a menu. Select "Fire Alarm." A fire alarm will be placed on the wall. | |||
Secure the Fire Alarm with a wrench. | |||
Insert circuit board (fire alarm) into the Fire Alarm. | |||
Use a screw driver on the fir alarm. | |||
Add add 5 wires worth of cable into the fire alarm. | |||
Use a screw driver on the fire alarm. | |||
=== Floor mounts === | |||
==== Holopad ==== | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|2 x [[File:Metal.png|Metal]], 2 x [[File:Glass_r.png|Reinforced glass]] , 1x [[File:CableCoils.png|Wire coil]], 1x [[File:Circuitboard.png|Circuitboard]] Holopad, [[File:Screwdriver_tool.png|Screwdriver]] | |||
|} | |||
Use 2 steel sheets to build APC frame. | |||
Click on the APC frame while it's in your had to open a menu. | |||
Select holopad. | |||
Wrench the holopad into place. | |||
Insert circuit board (holopad) into the holopad. | |||
Use a screwdriver on the holopad. | |||
Insert 5 wires worth of cable coil into the holopad. | |||
Use 2 glass sheets on the holopad | |||
Use screwdriver on the holopad. | |||
=== Doors === | |||
====[[file:Hazard Door.png]] Emergency Shutter ==== | |||
{| style="background-color:#EEEEEE" width="350" | |||
!Requires | |||
|- | |||
|4 x [[File:Metal.png|Metal]], [[File:Wrench.png|Wrench]], 1x [[File:CableCoils.png|Wire coil]], 1x [[File:Circuitboard.png|Circuitboard]] Air Alarm Electronics | |||
|} | |||
Use the <font color="gray">'''metal'''</font> and make an Emergency Shutter Assembly. | |||
Wrench it inplace. | |||
Add cables to the apparatus. | |||
Add Air Alarm Electronics to it. | |||
==== [[File:Airlock.gif]] Airlock ==== | |||
{| style="background-color:#EEEEEE" width="350" | |||
!Requires | |||
|- | |||
|4 x [[File:Metal.png|Metal]], 1x [[File:Glass_r.png|Reinforced glass]], 1x [[File:CableCoils.png|Wire coil]], [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], 1x [[File:Circuitboard.png|Circuitboard]] | |||
|} | |||
Use the <font color="gray">'''metal'''</font> and make an Airlock Assembly | |||
Wrench it inplace | |||
Use pen to name the Airlock (OPTIONAL) | |||
Add reinforced glass (Only if you wish to make a glass airlock) | |||
Add wires | |||
Unlock the airlock electronic board with an ID | |||
Use the airlock electronic board and set the access level | |||
Add the airlock electronic board to the airlock frame. | |||
Screwdriver to finish | |||
'''Damaged Airlocks''' | |||
Use metal sheets to repair damaged airlocks. Destroyed airlocks must be deconstructed. | |||
=== Misc buildings. === | |||
==== [[File:Computer_Solar.png]] Computers ==== | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|5 x [[File:Metal.png|Metal]], 2x [[File:Glass.png|Glass]], 1x [[File:CableCoils.png|Wire coil]] (5 pieces), [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], 1x [[File:Circuitboard.png|Circuitboard]] | |||
|} | |||
Use the <font color="gray">'''metal'''</font> to open the construction panel | |||
Choose Computer frame | |||
Wrench it inplace | |||
Insert Circuitboard | |||
Screwdriver | |||
Wires | |||
<font color="blue">'''glass'''</font> | |||
Screwdriver to finish | |||
==== [[File:AILarge.gif]] AI Core ==== | |||
{| style="background-color:#EEEEEE" width="450" | |||
!Requires | |||
|- | |||
|4 x [[File:Metal_r.png|Reinforced metal]], 2x [[File:Glass_r.png|Reinforced Glass]], 1x [[File:CableCoils.png|Wire Coil]], [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], 1x [[File:Circuitboard.png|AI Circuitboard]], optional: [[File:Brain.png|Human brain]] | |||
|} | |||
[[File:0AICore.png]]Build Frame from 4 <font color="gray">'''plasteel sheets'''</font> | |||
Wrench into place | |||
[[File:1AICore.png]]Add Circuit board | |||
[[File:2AICore.png]]Screwdriver | |||
[[File:3AICore.png]]Add wires | |||
[[File:4AICore.png]]Add brain placed in an MMI or a Posibrain (only if you want a NEW AI) | |||
[[File:5AICore.png]]Add <font color="blue">'''reinforced glass'''</font> | |||
Screwdriver | |||
=== [[File:Autolathe.gif]] Machine === | |||
Their construction detailed in the [[Guide_to_advanced_construction|machine construction guide.]] | |||
=== [[File:lightfixture.png]] Light Fixture === | |||
{| style="background-color:#EEEEEE" width="450" | |||
!Requires | |||
|- | |||
|2 x [[File:Metal.png|Metal]], 1x [[File:CableCoils.png|Wire Coil]], light tube/bulb,[[File:Screwdriver_tool.png|Screwdriver]] | |||
|} | |||
Build frame from 2 metal sheets (or 1 metal sheet for small lights) | |||
Place frame on wall | |||
Add wires | |||
Screwdriver | |||
Add light tube (or light bulb for small fixtures) | |||
=== [[File:Security_Camera.gif]] Security Camera === | |||
{| style="background-color:#EEEEEE" width="450" | |||
!Requires | |||
|- | |||
|1 x Camera Assembly, 1x [[File:CableCoils.png|Wire Coil]], [[File:Wrench.png|Wrench]], [[File:Welderon.gif|Welder]], [[File:Screwdriver_tool.png|Screwdriver]] | |||
|} | |||
Place the camera assembly on the tile where'd you like the camera to be. | |||
Wrench it into position | |||
Weld it to the wall. | |||
Add any additional upgrades. (OPTIONAL) | |||
Add wire. | |||
Screwdriver the camera to complete it. | |||
Set camera network (default is SS13) | |||
Set camera direction | |||
For upgrades, insert solid plasma for EMP proofing, a carrot for X-Ray and a proximity sensor for Motion. | |||
=== [[File:Turret.PNG]] Turrets === | |||
{| style="background-color:#EEEEEE" width="450" | |||
!requires | |||
|- | |||
|7 x [[File:Metal.png|Metal]], [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:Welderon.gif|Welder]], 1 x any energy-based gun , 1 x proximity sensor | |||
|} | |||
Build a turret frame from <font color="gray">'''metal'''</font> | |||
Use a wrench to secure the turret frame(it can be moved around before being secured) | |||
Use metal on the turret frame to build the cover | |||
Use a wrench on the frame to bolt the cover | |||
Add the gun | |||
Add the prox sensor | |||
Use a screwdriver to secure it all | |||
Use more <font color="gray">'''metal'''</font> on the frame | |||
Finally use a welder to secure the second layer of metal | |||
=== [[File:Floorbot.gif]][[File:Generic_borg.png]][[File:Ripley.png]]Robots, cyborgs and mechs === | |||
Their construction is described: [[Guide_to_robotics#Bots|robots]], [[Guide_to_robotics#Cyborgs|cyborgs]] and [[Guide_to_robotics#Mechs|mechs]]. | |||
=== [[File:Flamethrower.gif]] Flamethrower === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x [[File:Rods.png|Rods]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:Welderon.gif|Welder]], [[File:Igniter.png|Igniter]], [[File:Handheld-Plasmatank.png|Phoron Tank]] | |||
|} | |||
Screwdriver the welder | |||
Add rods to the welder to create the flamethrower | |||
Screwdriver the igniter | |||
Add the igniter to the flamethrower | |||
Screwdriver to finish | |||
Load a Phoron tank - high pressures work best | |||
You can also get one from a hacked [[Autolathe]], minus the plasma tank. | |||
It is not very useful but it is used in science and it can destroy alien weeds. | |||
=== [[File:disposal_pipe.png]][[File:disposal_bin.png]][[File:disposal_outlet.png]] Disposal Pipes and Machinery === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|1 x Disposal Pipe/Machine, [[File:Welderon.gif|Welder]], [[File:Wrench.png|Wrench]], [[File:Crowbar.png|Crowbar]] | |||
|} | |||
Retrieve the pipe/machine from the Disposal Pipe Dispenser (found in [[Atmospherics|Atmosia]]) | |||
Crowbar floortile if exists to access plating | |||
Move pipe over plating, rotate and flip using the rightclick menu | |||
Wrench pipe | |||
Weld pipe | |||
=== [[File:solar_assembly.png]][[File:solar_panel.png]][[File:solar_tracker.png]] Solar Panels and Trackers === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|[[File:solar_assembly.png|Solar Assembly]], [[File:Wrench.png|Wrench]], [[File:Glass.png|Glass]] or [[File:Glass_r.png|Reinforced Glass]], [[File:Circuitboard.png|Tracker Electronics]] (OPTIONAL) | |||
|} | |||
Place the solar assembly on where you want to construct your solar panel/tracker. To connect it to a wire you must construct it under a wire node. | |||
Wrench the solar assembly into place. | |||
Add the electronics if you want to create a solar tracker (OPTIONAL) | |||
Finish the construction by placing glass, or reinforced glass, into the assembly frame. | |||
=== Bookcase === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|5 x [[File:Planks.png]], [[File:Wrench.png|Wrench]], | |||
|} | |||
Construct a frame with 4 wooden planks. | |||
Wrench the frame into place. | |||
Add a plank to the frame to make a shelf. | |||
===[[File:Quantum Pad.gif]] Quantum Pad=== | |||
{| style="background-color:#EEEEEE" width="600" | |||
!Requires | |||
|- | |||
|[[File:Bluespace Crystal.png|Bluespace Crystal]], [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:CableCoils.png|Cable Coils]], 1x Manipulator (Quality determines how quickly it can teleport), 1x Capacitor (Quality determines how quickly it charges), 5x [[File:Metal.png|Steel Sheets]], [[File:Circuitboard.png|Circuit (Quantum Pad)]] | |||
|} | |||
Find a building site atop of a wire knot (in front of an APC works well). | |||
Construct frame parts with the steel sheets. | |||
Construct a machine frame with the frame parts. | |||
Wrench the machine frame in place. | |||
Add the circuit (qauntum pad) to the machine frame. | |||
Screwdriver the frame. | |||
Add Cable to the frame. | |||
Add the Bluespace Crystal to the frame. | |||
Add the manipulator to the frame. | |||
Add the capacitor to the frame. | |||
Add more cable, and the quantum pad should now look complete. | |||
IMPORTANT: Linking to another quantum pad requires you to copy the buffer data from this quantum pad and vice versa. | |||
To access the buffer data, use a screwdriver to open the side panel. | |||
Use a multitool to copy the data (This data is now saved onto your multitool). | |||
Close the panel with a screwdriver. | |||
To link back to this teleporter, use the multitool on another quantum pad with the panel '''closed'''. | |||
The second quantum pad is now linked to the first and will teleport you back to the original. Obtain the buffer data from the second quantum pad, and teleport back to the first, and add this data to the first pad. You have now got a functional two way teleporter. | |||
== Deconstruction == | |||
=== Floors === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Crowbar.png|Crowbar]], For light floors: [[File:Wirecutters.png|Wirecutters]] | |||
|} | |||
For all floors, use a crowbar on a floor tile to remove it | |||
If you're working on a light floor, you can further dismantle the light floor tile: | |||
Use a crowbar on the light tile to remove the metal | |||
Use wirecutters on the resulting tile to separate wires from glass | |||
=== Walls === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Welderon.gif|Welder]], [[File:Wrench.png|Wrench]] (Or [[File:Crowbar.png|Crowbar]]) | |||
|} | |||
Weld off the plating | |||
Wrench the girders apart | |||
(Alternately, you can use a Crowbar to dislodge the girders and drag them out of the way) | |||
=== Reinforced walls === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Welderon.gif|Welder]], [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:Wirecutters.png|Wirecutters]], [[File:Crowbar.png|Crowbar]] | |||
|} | |||
Wirecutters. | |||
Screwdriver. | |||
Welder. | |||
Crowbar. | |||
Wrench. | |||
Welder. | |||
Crowbar. | |||
Screwdriver. | |||
Wirecutters. | |||
Wrench. | |||
=== Grille === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Wirecutters.png|Wirecutters]]<br>or<br>[[File:Screwdriver_tool.png|Screwdriver]] | |||
|} | |||
Use wirecutters twice to destroy the grille OR | |||
Use screwdriver to unfasten it | |||
First method destroys it, giving two sets of metal rods. Wirecutters will remove it instantly, attacking the grill will instead kick it, requiring a good few kicks. Second loosens the grille, allowing it to be pulled around. Destroying the grill in this method will leave behind a still-secured section of broken grill which may be walked over but is not aesthetically pleasing. Wirecutters will not instantly remove this remnant. However, using a lit welder will destroy it instantly. | |||
=== Glass panels === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Welderon.gif|Welder]]<br>or<br>[[File:Screwdriver_tool.png|Screwdriver]],[[File:wrench.png|wrench]] | |||
|} | |||
Lots of Welder usage to destroy it | |||
or | |||
Screwdriver to detach it from its sockets, then wrench to dismantle it to glass sheets. | |||
=== Reinforced glass panels === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Crowbar.png|Crowbar]], [[File:Screwdriver_tool.png|Screwdriver]] | |||
|} | |||
Screwdriver to loosen the pane. | |||
Crowbar to pop it out. | |||
Screwdriver to unscrew the frame. | |||
Hitting the pane repeatedly with a blunt item or welder will smash it into one set of metal rods and a glass shard. | |||
=== Hidden Door (Regular or Reinforced) === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Screwdriver_tool.png|Screwdriver]],[[File:Welderon.gif|Welder]], [[File:Wrench.png|Wrench]] | |||
|} | |||
Screwdriver | |||
Welder | |||
Wrench | |||
=== Table === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Wrench.png|Wrench]] | |||
|} | |||
Wrench to disassemble the plating. | |||
Wrench again to dismantle the table frame. | |||
=== Reinforced Table === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Screwdriver_tool.png|Screwdriver]], [[File:Wrench.png|Wrench]] | |||
|} | |||
Remove the reinforcements with the screwdriver. | |||
Wrench to disassemble the plating. | |||
Wrench again to dismantle the frame. | |||
=== Wall Mountings === | |||
==== APC ==== | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Screwdriver_tool.png|Screwdriver]], [[File:Wirecutters.png|Wirecutters]], [[File:Crowbar.png|Crowbar]], [[File:Welderon.gif|Welder]], [[File:Id regular.png|Authorized ID]], | |||
|} | |||
Swipe Card to unlock APC. | |||
Remove Power Cell. | |||
Screwdriver to unsecure electronics. | |||
Crowbar to lift floor tile in front of APC | |||
Wirecutters to remove cables. | |||
Crowbar to remove Power Control Board. | |||
Welder to remover from wall. | |||
Wrenching the frame that is now detached from the wall de-constructs it to two metal sheets. | |||
==== Air Alarm ==== | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Screwdriver_tool.png|Screwdriver]], [[File:Wirecutters.png|Wirecutters]], [[File:Crowbar.png|Crowbar]], [[File:Wrench.png|Wrench]] | |||
|} | |||
Open cover with screwdriver. | |||
Cut all the wires using wirecutters. | |||
Cut the remaining wires by clicking on the airalarm with wirecutters. | |||
Pry out the circuit using the crowbar. | |||
Remove the frame from the wall using the wrench. | |||
==== Fire Alarm ==== | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Screwdriver_tool.png|Screwdriver]], [[File:Wirecutters.png|Wirecutters]], [[File:Crowbar.png|Crowbar]], [[File:Wrench.png|Wrench]] | |||
|} | |||
Open cover with screwdriver. | |||
Cut the wires by clicking on the firealarm with wirecutters. | |||
Pry out the circuit using the crowbar. | |||
Remove the frame from the wall using the wrench. | |||
=== Emergency Shutter === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Welderon.gif|Welder]], [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:Crowbar.png|Crowbar]] | |||
|} | |||
Screwdriver the shutter to open it's hatch. | |||
Crowbar the Electronics out. | |||
Wrench the shutter assembly to unsecure it. | |||
Weld the unsecured assembly to disassemble it into sheets of metal. | |||
=== Airlock === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Welderon.gif|Welder]], [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:Wirecutters.png|Wirecutters]], [[File:Crowbar.png|Crowbar]], [[File:Multitool.png|Multitool]] | |||
|} | |||
Screwdriver the door. | |||
Use multitool and wirecutters to disable everything except the doorbolts as detailed [[Hacking#Airlocks|here.]] Doorbolts must be up for this to work. | |||
Weld the door shut. | |||
Crowbar the electronics out. (if the door is electrified, this won't work for some reason) | |||
Wirecut the wires out. | |||
Unsecure it with a wrench. | |||
Weld it to deconstruct to metal plates. | |||
Cannot be done to an [[Syndicate_Items#Cryptographic_Sequencer|emagged]] airlock. RCD deconstruction must be used for that. It is possible to build a new airlock over the emagged one. | |||
=== Computers === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Welderon.gif|Welder]], [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:Wirecutters.png|Wirecutters]], [[File:Crowbar.png|Crowbar]] | |||
|} | |||
Screwdriver to detach the screen. | |||
Crowbar to pry off the screen. | |||
Wirecutters to cut the cables. | |||
Screwdriver to detach the circuit lid. | |||
Crowbar to pry out the circuit. | |||
Wrench to detach the frame. | |||
Welder to disassemble the frame. | |||
Returns all components used in construction. | |||
=== Machine === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Screwdriver_tool.png|Screwdriver]], [[File:Crowbar.png|Crowbar]], [[File:Wirecutters.png|Wirecutters]], [[File:Wrench.png|Wrench]] | |||
|} | |||
Screwdriver to open the cover. | |||
Crowbar to pry out the circuit. | |||
Wirecutters to remove the wires. | |||
Wrench to disassemble the frame. | |||
Usually returns all or most components used in construction. Some components may become broken. | |||
=== Recharge Station === | |||
{| style="background-color:#EEEEEE" width="400" | |||
!Requires | |||
|- | |||
|[[File:Screwdriver_tool.png|Screwdriver]], [[File:Crowbar.png|Crowbar]], [[File:Wirecutters.png|Wirecutters]], [[File:Wrench.png|Wrench]], [[File:Id regular.png|Authorized ID]] | |||
|} | |||
Unlock the charger with an ID | |||
Screwdriver to open the cover. | |||
Wrench to dislodge the internal plating. | |||
Wirecutters to remove the wires. | |||
Crowbar to remove the components. | |||
Usually returns all or most components used in construction. Some components may become broken. | |||
=== Security Camera === | |||
{| style="background-color:#EEEEEE" width="450" | |||
!Requires | |||
|- | |||
|[[File:Screwdriver_tool.png|Screwdriver]], [[File:Wirecutters.png|Wirecutters]], [[File:Crowbar.png|Crowbar]], [[File:Wrench.png|Wrench]], [[File:Welderon.gif|Welder]] | |||
|} | |||
Screwdriver the camera to open the back panel. | |||
Use your wirecutter to cut all the wires. (Cutting the alarm wire is optional) | |||
Use your welder to unweld the camera from the wall. | |||
Wrench the camera to unattach it from the wall. | |||
Crowbar the camera assembly to remove any upgrades. | |||
=== Disposal Pipes === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|[[File:Welderon.gif|Welder]], [[File:Wrench.png|Wrench]] | |||
|} | |||
Welder on pipe to remove its joints | |||
Wrench to detach it from the plating | |||
Note: You can then click and drag the pipe segment onto the disposal pipe dispenser to delete it | |||
==== Disposal Machinery ==== | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|[[File:Screwdriver_tool.png|Screwdriver]], [[File:Welderon.gif|Welder]], [[File:Wrench.png|Wrench]] | |||
|} | |||
If Disposal Bin, turn off the pump | |||
Screwdriver to remove power connection | |||
Welder on machine to remove its joints | |||
Wrench to detach it from the plating | |||
=== [[File:solar_assembly.png]][[File:solar_panel.png]][[File:solar_tracker.png]] Solar Panels and Trackers === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|[[File:crowbar.png|Crowbar]], [[File:Wrench.png|Wrench]] | |||
|} | |||
Take out the panel with a crowbar. | |||
If you are deconstructing a tracker, you can take out the electronics with your crowbar (OPTIONAL) | |||
Unwrench the leftover assembly from it's place and you will be able to move it. | |||
=== Locker === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|[[File:welderon.gif|Welder]] | |||
|} | |||
Open the locker. | |||
Weld the locker. | |||
=== Window-door (Windoor) === | |||
{| style="background-color:#EEEEEE" width="300" | |||
!Requires | |||
|- | |||
|[[File:Welderon.gif|Welder]], [[File:Wrench.png|Wrench]], [[File:Screwdriver_tool.png|Screwdriver]], [[File:Wirecutters.png|Wirecutters]], [[File:Crowbar.png|Crowbar]] | |||
|} | |||
Open the windoor. | |||
Use a crowbar on the windoor. | |||
Use a screwdriver on the windoor. | |||
Use wirecutters on the windoor. | |||
Use a wrench on the windoor. | |||
Weld the windoor. | |||
<br><br> | |||
[[Category:Guides]] | |||
{{Gameplay guides}} |
Latest revision as of 08:49, 9 November 2022
For the basics on construction and deconstruction, see Basic Construction.
For the construction of machines, see Guide to Advanced Construction.
For the construction of weapons, see Improvised Weapons.
Construction
Advanced Materials
Rods
Requires |
---|
1 x |
Use metal and click "2x metal rods" (makes two sets of rods)
Floor tiles
Requires |
---|
1 x |
Use metal and click "4x floor tiles" (makes 4 floor tiles)
Reinforced Glass
Requires |
---|
1 x , 1 x |
Use rods on glass
Reinforced Metal
Smelted with a combination of iron ore, coal and platinum ore ore at the Mining furnace.
Floor
Lattice
Requires |
---|
1 x |
The basic base for all types of construction, this is placed directly in space. Place by having rods in your hand, and clicking on a empty space tile.
Plating
Requires |
---|
1 x |
The basic floor which you put things like wires and pipes upon, 'all' floor is built ontop of this. Place by having the floor tile in your hand, and click on a lattice.
Steel Floor
Requires |
---|
1 x |
This is the basic "nice" floor, this floor should be considered used in all public areas, hence why there's none of these in maintence. Place by having the floor tile in your hand, and click on a Plating tile.
Light Floor
Requires |
---|
1 x , 1 x , 5 x |
Assuming there already is a plating Use the wire on glass Use the metal on the tile you get Place the light tile on the plating
Walls
Requires |
---|
2 x , 2 x OR any stacked material |
Click the metal in your hand to open the construction panel, Choose 'wall girders' from the list Use the remaining 2 sheets of metal (or some other material) on the girders
Reinforced walls
Requires |
---|
2 x , 4 x OR any stacked material |
Click the metal in your hand to open the construction panel, Choose 'wall girders' form the list Right-click on the girders with your reinforced metal (or some other material) in hand and choose "Reinforce girder" Use the last sheet of reinforced metal (or some other material) on the reinforced girders to finish the wall
Grille
Requires |
---|
2 x |
Stand where you wish the grille to be placed Click on the stack of 2 rods with the hand you have them in
Glass panels
One directional
Requires |
---|
1 x , |
Click the glass pane Click the "one direct" button Right-click the new pane and rotate it Use the screwdriver to fasten it down
Alternatively: Use the glass on a grille. Right-click the new pane and rotate it Use the screwdriver to fasten it down
Full
Requires |
---|
2 x , |
Click the glass pane Click the "full" button Use the screwdriver to fasten it down
Reinforced glass panels
One directional
Requires |
---|
1 x , , |
Click the reinforced glass pane Click the "one direct" button Right-click the new pane and rotate it Screwdriver (Secure frame to floor.) Crowbar (Pop pane in.) Screwdriver (Secure pane.)
Alternatively: Use the reinforced glass on a grille. Right-click the new pane and rotate it Screwdriver (Secure frame to floor.) Crowbar (Pop pane in.) Screwdriver (Secure pane.)
Full
Requires |
---|
2 x , , |
Click the reinforced glass pane Click the "full" button Screwdriver Crowbar Screwdriver
Window-door (Windoor)
Requires |
---|
5 x , 4x , 1x , , , , 1x |
Click the reinforced glass pane Click the "Windoor" button Wrench Rods(Optional: To create a secure windoor) Cable Airlock Electronics Crowbar
Hidden Door
Regular
Requires |
---|
4 x , |
Click the metal in your hand to open the construction panel, Choose 'Build wall girders' form the list Use crowbar on girders and wait a few seconds for the girders to dislodge. Use the remaining 2 sheets of metal on the girders
To turn a wall into a hidden door, follow the deconstruction guide for the wall type until the final wrenching, and instead proceed from the "Use crowbar on girders" line above.
Reinforced
Requires |
---|
2 x ,2 x , |
Click the metal in your hand to open the construction panel, Choose 'Build wall girders' form the list Use crowbar on girders and wait a few seconds for the girders to dislodge. Use the reinforced metal on the dislodged girders twice to finish it
Wall Mountings
APC
Requires |
---|
2 x , 1x , 1x Power Control Module, , 1x , , |
Use the 2 sheets of metal and create an APC frame. Place the frame on the wall you wish to attach the APC to. Add the Power control module to the APC add the wire coil. Use the screw driver on the APC. Insert the Power Cell. Crowbar shut. It starts ID locked, with the cover engaged and the main switch turned off.
APCs may only be placed in areas which have been defined as a Station Area using the Chief Engineer's Station Blueprints. If you're trying to replace a broken APC, you can get the cover off by breaking it, likely with a fire extinguisher.
Air Alarm
Requires |
---|
5 x , 1x , 1x Air Alarm Electronics, |
Use 5 steel sheets to construct a "Frame". Pick up the "Frame Parts" that you just created. With Frame Parts selected in your hands. Click on a wall to open a menu. Select "Air Alarm." A air alarm will be placed on the wall. Secure the Air alarm with a wrench. Insert circuit board (Air alarm) into the Air Alarm. Use screw driver on it. Add 5 wires to it. Use screw driver on it.
Fire Alarm
Requires |
---|
5 x , 1x , 1x Fire Alarm Electronics, |
Use 5 steel sheets to construct a "Frame". Pick up the "Frame Parts" that you just created. With Frame Parts selected in your hands. Click on a wall to open a menu. Select "Fire Alarm." A fire alarm will be placed on the wall. Secure the Fire Alarm with a wrench. Insert circuit board (fire alarm) into the Fire Alarm. Use a screw driver on the fir alarm. Add add 5 wires worth of cable into the fire alarm. Use a screw driver on the fire alarm.
Floor mounts
Holopad
Requires |
---|
2 x , 2 x , 1x , 1x Holopad, |
Use 2 steel sheets to build APC frame. Click on the APC frame while it's in your had to open a menu. Select holopad. Wrench the holopad into place. Insert circuit board (holopad) into the holopad. Use a screwdriver on the holopad. Insert 5 wires worth of cable coil into the holopad. Use 2 glass sheets on the holopad Use screwdriver on the holopad.
Doors
Emergency Shutter
Requires |
---|
4 x , , 1x , 1x Air Alarm Electronics |
Use the metal and make an Emergency Shutter Assembly. Wrench it inplace. Add cables to the apparatus. Add Air Alarm Electronics to it.
Airlock
Requires |
---|
4 x , 1x , 1x , , , 1x |
Use the metal and make an Airlock Assembly Wrench it inplace Use pen to name the Airlock (OPTIONAL) Add reinforced glass (Only if you wish to make a glass airlock) Add wires Unlock the airlock electronic board with an ID Use the airlock electronic board and set the access level Add the airlock electronic board to the airlock frame. Screwdriver to finish
Damaged Airlocks Use metal sheets to repair damaged airlocks. Destroyed airlocks must be deconstructed.
Misc buildings.
Computers
Requires |
---|
5 x , 2x , 1x (5 pieces), , , 1x |
Use the metal to open the construction panel Choose Computer frame Wrench it inplace Insert Circuitboard Screwdriver Wires glass Screwdriver to finish
AI Core
Requires |
---|
4 x , 2x , 1x , , , 1x , optional: |
Build Frame from 4 plasteel sheets Wrench into place Add Circuit board Screwdriver Add wires Add brain placed in an MMI or a Posibrain (only if you want a NEW AI) Add reinforced glass Screwdriver
Machine
Their construction detailed in the machine construction guide.
Light Fixture
Requires |
---|
2 x , 1x , light tube/bulb, |
Build frame from 2 metal sheets (or 1 metal sheet for small lights) Place frame on wall Add wires Screwdriver Add light tube (or light bulb for small fixtures)
Security Camera
Requires |
---|
1 x Camera Assembly, 1x , , , |
Place the camera assembly on the tile where'd you like the camera to be. Wrench it into position Weld it to the wall. Add any additional upgrades. (OPTIONAL) Add wire. Screwdriver the camera to complete it. Set camera network (default is SS13) Set camera direction
For upgrades, insert solid plasma for EMP proofing, a carrot for X-Ray and a proximity sensor for Motion.
Turrets
requires |
---|
7 x , , , , 1 x any energy-based gun , 1 x proximity sensor |
Build a turret frame from metal Use a wrench to secure the turret frame(it can be moved around before being secured) Use metal on the turret frame to build the cover Use a wrench on the frame to bolt the cover Add the gun Add the prox sensor Use a screwdriver to secure it all Use more metal on the frame Finally use a welder to secure the second layer of metal
Robots, cyborgs and mechs
Their construction is described: robots, cyborgs and mechs.
Flamethrower
Requires |
---|
1 x , , , , |
Screwdriver the welder Add rods to the welder to create the flamethrower Screwdriver the igniter Add the igniter to the flamethrower Screwdriver to finish Load a Phoron tank - high pressures work best
You can also get one from a hacked Autolathe, minus the plasma tank. It is not very useful but it is used in science and it can destroy alien weeds.
Disposal Pipes and Machinery
Requires |
---|
1 x Disposal Pipe/Machine, , , |
Retrieve the pipe/machine from the Disposal Pipe Dispenser (found in Atmosia) Crowbar floortile if exists to access plating Move pipe over plating, rotate and flip using the rightclick menu Wrench pipe Weld pipe
Solar Panels and Trackers
Requires |
---|
, , or , (OPTIONAL) |
Place the solar assembly on where you want to construct your solar panel/tracker. To connect it to a wire you must construct it under a wire node. Wrench the solar assembly into place. Add the electronics if you want to create a solar tracker (OPTIONAL) Finish the construction by placing glass, or reinforced glass, into the assembly frame.
Bookcase
Requires |
---|
5 x , , |
Construct a frame with 4 wooden planks. Wrench the frame into place. Add a plank to the frame to make a shelf.
Quantum Pad
Requires |
---|
, , , , 1x Manipulator (Quality determines how quickly it can teleport), 1x Capacitor (Quality determines how quickly it charges), 5x , |
Find a building site atop of a wire knot (in front of an APC works well). Construct frame parts with the steel sheets. Construct a machine frame with the frame parts. Wrench the machine frame in place. Add the circuit (qauntum pad) to the machine frame. Screwdriver the frame. Add Cable to the frame. Add the Bluespace Crystal to the frame. Add the manipulator to the frame. Add the capacitor to the frame. Add more cable, and the quantum pad should now look complete. IMPORTANT: Linking to another quantum pad requires you to copy the buffer data from this quantum pad and vice versa. To access the buffer data, use a screwdriver to open the side panel. Use a multitool to copy the data (This data is now saved onto your multitool). Close the panel with a screwdriver. To link back to this teleporter, use the multitool on another quantum pad with the panel closed. The second quantum pad is now linked to the first and will teleport you back to the original. Obtain the buffer data from the second quantum pad, and teleport back to the first, and add this data to the first pad. You have now got a functional two way teleporter.
Deconstruction
Floors
Requires |
---|
, For light floors: |
For all floors, use a crowbar on a floor tile to remove it If you're working on a light floor, you can further dismantle the light floor tile: Use a crowbar on the light tile to remove the metal Use wirecutters on the resulting tile to separate wires from glass
Walls
Requires |
---|
, (Or ) |
Weld off the plating Wrench the girders apart (Alternately, you can use a Crowbar to dislodge the girders and drag them out of the way)
Reinforced walls
Requires |
---|
, , , , |
Wirecutters. Screwdriver. Welder. Crowbar. Wrench. Welder. Crowbar. Screwdriver. Wirecutters. Wrench.
Grille
Requires |
---|
or |
Use wirecutters twice to destroy the grille OR Use screwdriver to unfasten it
First method destroys it, giving two sets of metal rods. Wirecutters will remove it instantly, attacking the grill will instead kick it, requiring a good few kicks. Second loosens the grille, allowing it to be pulled around. Destroying the grill in this method will leave behind a still-secured section of broken grill which may be walked over but is not aesthetically pleasing. Wirecutters will not instantly remove this remnant. However, using a lit welder will destroy it instantly.
Glass panels
Requires |
---|
or , |
Lots of Welder usage to destroy it or Screwdriver to detach it from its sockets, then wrench to dismantle it to glass sheets.
Reinforced glass panels
Requires |
---|
, |
Screwdriver to loosen the pane. Crowbar to pop it out. Screwdriver to unscrew the frame.
Hitting the pane repeatedly with a blunt item or welder will smash it into one set of metal rods and a glass shard.
Hidden Door (Regular or Reinforced)
Requires |
---|
,, |
Screwdriver Welder Wrench
Table
Requires |
---|
Wrench to disassemble the plating. Wrench again to dismantle the table frame.
Reinforced Table
Requires |
---|
, |
Remove the reinforcements with the screwdriver. Wrench to disassemble the plating. Wrench again to dismantle the frame.
Wall Mountings
APC
Requires |
---|
, , , , , |
Swipe Card to unlock APC. Remove Power Cell. Screwdriver to unsecure electronics. Crowbar to lift floor tile in front of APC Wirecutters to remove cables. Crowbar to remove Power Control Board. Welder to remover from wall. Wrenching the frame that is now detached from the wall de-constructs it to two metal sheets.
Air Alarm
Requires |
---|
, , , |
Open cover with screwdriver. Cut all the wires using wirecutters. Cut the remaining wires by clicking on the airalarm with wirecutters. Pry out the circuit using the crowbar. Remove the frame from the wall using the wrench.
Fire Alarm
Requires |
---|
, , , |
Open cover with screwdriver. Cut the wires by clicking on the firealarm with wirecutters. Pry out the circuit using the crowbar. Remove the frame from the wall using the wrench.
Emergency Shutter
Requires |
---|
, , , |
Screwdriver the shutter to open it's hatch. Crowbar the Electronics out. Wrench the shutter assembly to unsecure it. Weld the unsecured assembly to disassemble it into sheets of metal.
Airlock
Requires |
---|
, , , , , |
Screwdriver the door. Use multitool and wirecutters to disable everything except the doorbolts as detailed here. Doorbolts must be up for this to work. Weld the door shut. Crowbar the electronics out. (if the door is electrified, this won't work for some reason) Wirecut the wires out. Unsecure it with a wrench. Weld it to deconstruct to metal plates.
Cannot be done to an emagged airlock. RCD deconstruction must be used for that. It is possible to build a new airlock over the emagged one.
Computers
Requires |
---|
, , , , |
Screwdriver to detach the screen. Crowbar to pry off the screen. Wirecutters to cut the cables. Screwdriver to detach the circuit lid. Crowbar to pry out the circuit. Wrench to detach the frame. Welder to disassemble the frame.
Returns all components used in construction.
Machine
Requires |
---|
, , , |
Screwdriver to open the cover. Crowbar to pry out the circuit. Wirecutters to remove the wires. Wrench to disassemble the frame.
Usually returns all or most components used in construction. Some components may become broken.
Recharge Station
Requires |
---|
, , , , |
Unlock the charger with an ID Screwdriver to open the cover. Wrench to dislodge the internal plating. Wirecutters to remove the wires. Crowbar to remove the components.
Usually returns all or most components used in construction. Some components may become broken.
Security Camera
Requires |
---|
, , , , |
Screwdriver the camera to open the back panel. Use your wirecutter to cut all the wires. (Cutting the alarm wire is optional) Use your welder to unweld the camera from the wall. Wrench the camera to unattach it from the wall. Crowbar the camera assembly to remove any upgrades.
Disposal Pipes
Requires |
---|
, |
Welder on pipe to remove its joints Wrench to detach it from the plating
Note: You can then click and drag the pipe segment onto the disposal pipe dispenser to delete it
Disposal Machinery
Requires |
---|
, , |
If Disposal Bin, turn off the pump Screwdriver to remove power connection Welder on machine to remove its joints Wrench to detach it from the plating
Solar Panels and Trackers
Requires |
---|
, |
Take out the panel with a crowbar. If you are deconstructing a tracker, you can take out the electronics with your crowbar (OPTIONAL) Unwrench the leftover assembly from it's place and you will be able to move it.
Locker
Requires |
---|
Open the locker. Weld the locker.
Window-door (Windoor)
Requires |
---|
, , , , |
Open the windoor. Use a crowbar on the windoor. Use a screwdriver on the windoor. Use wirecutters on the windoor. Use a wrench on the windoor. Weld the windoor.
Guide Table | ||||||||
Starter | VORE-Specific | Medical | Engineering | Science | Security | Other | Development | |